Draft PDS-01, BSR/RESNET/ICC 301-2022 Addendum A-202x, RECs

Proposed Standard BSR/RESNET/ICC 301-2022 Addendum A-202x amends the 2022 edition of Standard 301 to add a new Minimum Rated Feature where a Renewable Energy System’s onsite power production is included in the determination of energy ratings. The new MRF would be determining whether Renewable Energy Certificates are associated with Renewable Energy System and if so documenting their ownership status as “retired, retained ownership, sold/transferred, none associated with system or Unknown”. The amendment also adds a definition for Renewable Energy Certificate and modifies the definition of Infiltration Volume for clarity.

 

Draft PDS-01 of BSR/RESNET/ICC 301-2022 Addendum A-202x is submitted for public comment for 30 days, beginning March 18, 2022 and ending April 17, 2022. Only the changes shown in draft PDS-01 by strike-through and underline and red print are open for comment. To review and comment on the Draft follow the links below.

Draft PDS-01, BSR/RESNET/ICC 301-2022 Addendum A-202x

Comment on Draft PDS-01, BSR/RESNET/ICC 301-2022 Addendum A-202x

View comments on Draft PDS-01, BSR/RESNET/ICC 301-2022 Addendum A-202x

 

Tips and Reminders for Submitting Public Comments 

  • Comments must pertain to the changes to ANSI/RESNET/ICC 301-2022 shown as either strike-through or underlined text in red print in draft PDS-01. Comments on portions of draft PDS-01 where no change is indicated will be rejected.
  • Comments must include a specific proposed change to the text of the draft open for comment. Proposed added text must be underlined and text proposed to be removed must be shown using strike-through. If not submitted in this format, the public comment may be rejected.
  • Do not submit comments on standards other than this one that is out for public comment.
  • If you submit public comment representing the collective interests of a group of stakeholders, you are encouraged to submit ONE public comment and identify all stakeholders in that comment. While not required, this expedites the ability of the committees to respond to commenters in a timely manner.
  • Public comments are reviewed by committees with volunteer members, that are Raters, Providers, Software Developers and other industry and public interest stakeholders. They are not reviewed by RESNET Staff.
  • Most amendments to RESNET standards are proposed by industry and public stakeholders not RESNET. To learn more about submitting proposed amendments visit this page: https://www.resnet.us/about/standards/submit-proposed-amendments/