Proposed Addendum B to Standard ANSI/RESNET/ICC 301-2019 incorporates proposed clarifications to the 2019 update of Standard ANSI/RESNET/ICC 301 and addresses new energy use and conservation subjects. The major areas of change are: Clarification of what constitutes a Thermally Isolated Sunroom Clarification of what constitutes a Dwelling-Unit Mechanical Ventilation System Clarification that Approved Software Rating Tools must be used to analyze homes for energy ratings Clarification of which surfaces are included in Aext Clarification of the DSE to be used in calculations when no system is installed Clarification that the procedures of Standard 380-2019 can be used for duct leakage to outside test and total duct leakage can be used for duct leakage to outside Revisions necessary to translate use of the Standard for use in the southern hemisphere Clarification that the IEER must be used for commercial variable refrigerant flow multi-split AC and heat pump systems Clarification of which COP value should be used in calculations when AHRI has multiple options and software does not Clarification of which entity is authorized to establish default Minimum Rated Features (MRF) for use when the MRF cannot be determined without destructive disassembly of the home Clarification of what entity establishes QA requirements for Threshold Ratings, (i.e. the same entity that sets requirements for Confirmed and Sampled Ratings) Clarification that daily run hours are to be observed onsite for Individual exhaust fans operated using a programmed schedule Add criteria for calculating impacts of dehumidification equipment when installed and MRF for the equipment Add definitions essential to aligning Standard 301-2019 with proposed Standard 310 and capitalize the terms where used throughout the Standard Add references to Standard 310 Add Minimum Rated Feature criteria to be collected by raters essential for grading the installation of HVAC systems pursuant to Standard 310 Other minor editorial revisions This first draft, PDS-01, of BSR/RESNET/ICC 301-2019 Addendum B-20xx is submitted for public comment for 45 days. The changes to Standard ANSI/RESNET/ICCC 301-2019 as shown in draft PDS-01 by strike-through and underline and red print are open for comment. To review and comment on the Draft follow the links below. Draft PDS-01, BSR/RESNET/ICC 301-2019 Addendum B Comment on Draft PDS-01, BSR/RESNET/ICC 301-2019 Addendum B View comments on Draft PDS-01, BSR/RESNET/ICC 301-2019 Addendum B The public comment period will be open for 45 days beginning November 29, 2019, through January 13, 2020. Comments will be accepted only on text in draft PDS-01 shown by strike-through and underline in red print. Tips and Reminders for Submitting Public Comments Comments must include a specific proposed change to the text of the draft open for comment. Proposed added text must be underlined and text proposed to be removed must be shown using strike-through. If not submitted in this format, the public comment may be rejected If you submit public comment representing the collective interests of a group of stakeholders, you are encouraged to submit ONE public comment and identify all stakeholders in that comment. While not required, this expedites the ability of the committees to respond to commenters in a timely manner. Public comments are reviewed by committees with volunteer members, that are Raters, Providers, Software Developers, and other industry and public interest stakeholders. They are not reviewed by RESNET Staff. Most amendments to RESNET standards are proposed by industry and public stakeholders, not RESNET. To learn more about submitting proposed amendments visit this page: http://www.resnet.us/professional/standards/submitting_amendments